Garment quality inspection in a bright apparel studio.

Every garment inspected, four times.

Quality here is a sequence of gates rather than a final look-over: pre-production, inline, midline and final, each with its own sign-off before the next begins.

Inspection
100% of units
Sampling
AQL 2.5
System
ISO 9001:2015
Gates
Four, in sequence

01Pre-production

Nothing starts until the inputs are signed off.

Cheaper to fix before cutting than after.

  • PPM sheet review
  • Fabric approval
  • Trim approval
  • Lab dip sign-off

02Inline

Checked while it is still being made.

Caught on the line, a fault costs one garment. Caught at the end, it costs the batch.

  • Workmanship check
  • Measurement verification
  • Colour fastness

03Midline

Construction verified before finishing.

  • Stitch density
  • Seam strength
  • Trim attachment

04Final

Every unit, not a sample.

Final inspection is 100% of units, then an AQL-sampled audit on top of it — the sampling standard is the floor here, not the method.

  • 100% inspection
  • AQL compliance
  • Packing accuracy
  • Final QA sign-off

05Standards

Measured against something.

06Enquire

Have a collection in development?

Creative Impression

Vertically integrated apparel manufacturing and export.Gurugram, Haryana, India.Government recognized export house since 1997.

Explore

Our brands

Work with us

© 2026 Creative Impression. All rights reserved.