Every garment inspected, four times.
Quality here is a sequence of gates rather than a final look-over: pre-production, inline, midline and final, each with its own sign-off before the next begins.
01Pre-production
Nothing starts until the inputs are signed off.
Cheaper to fix before cutting than after.
- PPM sheet review
- Fabric approval
- Trim approval
- Lab dip sign-off
02Inline
Checked while it is still being made.
Caught on the line, a fault costs one garment. Caught at the end, it costs the batch.
- Workmanship check
- Measurement verification
- Colour fastness
03Midline
Construction verified before finishing.
- Stitch density
- Seam strength
- Trim attachment
04Final
Every unit, not a sample.
Final inspection is 100% of units, then an AQL-sampled audit on top of it — the sampling standard is the floor here, not the method.
- 100% inspection
- AQL compliance
- Packing accuracy
- Final QA sign-off
05Standards
Measured against something.
ISO 9001:2015
Quality management systemCertified; the process above is documented and audited.
AQL 2.5
Sampling standardApplied after 100% inspection, not instead of it.
Testing
International compliance testingGarments tested to the standards of the destination market, not only to our own.
Audit
Third-party audit readyRecords are kept so a buyer or their appointed auditor can inspect the process at any point.